construction_01

Construction

Construction of the XENON1T water tank: The floor in Hall B is prepared with self-leveling concrete. Image: Roberto Corrieri/XENON.

Construction of the XENON1T water tank: The floor in Hall B is prepared with self-leveling concrete. Image: Roberto Corrieri/XENON.