construction_05

Construction

Construction of the XENON1T water tank: As the large crane lifts the roof up, the second ring is welded on. Image: Roberto Corrieri/XENON.

Construction of the XENON1T water tank: As the large crane lifts the roof up, the second ring is welded on. Image: Roberto Corrieri/XENON.